CMMI and ITIL

Published by Kanav Gupta in CMMI on March 28th, 2012

CMMI Vs. ITIL

CMMI and ITIL are two distinctly different maturity models. The fundamental difference between CMMI vs ITIL is that while CMMI focuses on software process maturity, ITIL is broader in scope and focus on all areas of infrastructure, including software and hardware.

Origins

Carnegie Mellon University (CMU)’s Software Engineering Institute developed the first Capability Maturity Model (CMM) in 1990, and followed it up with the Capability Maturity Model Integration (CMMI) that integrated multiple CMMs.

The United Kingdom’s Office of Government Commerce (OGC) developed the IT Infrastructure Library (ITIL) in 1986 to provide guidance for service management. These set of guidelines has since then emerged as the international de facto standard framework of best practices for IT service management and infrastructure. ITIL originated as a collection of books, each covering a specific practice within the IT service management.

Tags: ,

GG & GP

Published by Kanav Gupta in CMMI on March 27th, 2012

Generic Goals and Practices are a part of every process area.

 GG 1 Achieve Specific Goals
 GP 1.1 Perform Specific Practices

 GG 2 Institutionalize a Managed Process
 GP 2.1 Establish an Organizational Policy
 GP 2.2 Plan the Process
 GP 2.3 Provide Resources
 GP 2.4 Assign Responsibility
 GP 2.5 Train People
 GP 2.6 Control Work Products
 GP 2.7 Identify and Involve Relevant Stakeholders
 GP 2.8 Monitor and Control the Process
 GP 2.9 Objectively Evaluate Adherence
 GP 2.10 Review Status with Higher Level Management

 GG 3 Institutionalize a Defined Process
 GP 3.1 Establish a Defined Process
 GP 3.2 Collect Process Related Experiences

Tags: , ,

CMMI – Development

Published by Kanav Gupta in CMMI on March 26th, 2012

Maturity Levels: CMMI for Development

There are five maturity levels. However, maturity level ratings are awarded for levels 2 through 5. The process areas below and their maturity levels are listed for the CMMI for Development model:

Maturity Level 2 – Managed
 CM – Configuration Management
 MA – Measurement and Analysis
 PMC – Project Monitoring and Control
 PP – Project Planning
 PPQA – Process and Product Quality Assurance
 REQM – Requirements Management
 SAM – Supplier Agreement Management

Maturity Level 3 – Defined
 DAR – Decision Analysis and Resolution
 IPM – Integrated Project Management
 OPD – Organizational Process Definition
 OPF – Organizational Process Focus
 OT – Organizational Training
 PI – Product Integration
 RD – Requirements Development
 RSKM – Risk Management
 TS – Technical Solution
 VAL – Validation
 VER – Verification

Maturity Level 4 – Quantitatively Managed
 OPP – Organizational Process Performance
 QPM – Quantitative Project Management

Maturity Level 5 – Optimizing
 CAR – Causal Analysis and Resolution
 OPM – Organizational Performance Management

Move Files to SharePoint 2010

Need to move file shares to SharePoint 2010?
Comment on this post for a need based special information bulletin of Powerful Tool(s) that can help move file shares quickly and easily, to Consolidate / Migrate / Transform old IT Infrastructure.

Key Benefit Highlights:
» Faster, less error-prone file share migrations to SharePoint 2010.
» Maintain custom content types.
» Make your content more “findable” by maintaining or adding metadata “tags” during migration
» Quickly update after migration.
» Maintain historic and source information, and folder structures.
» Completely transform data during migration.
» Put content migration decisions into the hands of data owners, online or offline, using MS Excel.
» Discover content to be migrated based on date ranges, file size, or file extension.
» Integrates with SharePoint 2010 Managed Metadata Service.

This could be a chance to look at this Flexible, Easy to Use and Exciting Technology.

© Kanav's Infosite